T.CL-2A
2021-09-29 16:43      Click£ºtimes
            | Antenna | T.CL-2A | 
| High frequency head | T.CL-2A | 
| Amplification board | T.CL-2A | 
| Power supply board | T.CL-2A | 
| Display board | T.CL-2A | 
| Transformer | T.CL-2A | 
| Signal line | T.CL-2A | 
| The reducer control board | KB-JA | 
| Measuring the long board | CB | 
| Input-output interface board | IOB | 
| Access control board | KB-L | 
| 5V power supply board | 3UTW-CPCI/5V | 
| Upper control machine | ADVANTECH | 
| Operation and maintenance workstation | ADVANTECH | 
| Camel Peak Switch | HUAWEI | 
| 24V\12V interface power supply | TD-500 | 
| Camel peak measuring long power supply | DSBY | 
| Measuring long transformer | CCB | 
| Measure the length of the return transformer | CCB | 
| Indoor length-measuring filter | LBQ-H | 
| The Moose System Outdoor Pedal | TLJ | 
| Air switch | |
| Standard guide rail | 35MM | 
| End row | |
| Power cable | VV22 1kV 2 Core 4mm2 | 
| Ground thing lead copper strip | |
| Control cable | KVV 500V 5 Core 1.5mm2 | 
| Control cable | KVV 500V 4 Core 2.5mm2 | 
| Control cable | KVV 500V 7 Core 2.5mm2 | 
| Power cable | VV22 1kV 3 Core 6mm2 | 
| Isolate transformer screen | |
| Ground connection | 25mm2 | 
| WDZ-RYY soft cord | Section of 1.5mm2 2 core | 
| Surge protector (including supporting open) | 385V10/350US 2P | 
| Surge protector (including supporting open) | 385V8/20 US 4P | 
| Surge protector (including supporting open) | 385V8/20 US 2P | 
| Surge protector (including supporting open) | DC110V 8/20 US 3P | 
| Surge protector (including supporting open) | DC110V 8/20 US 2P | 
| Surge protector (including supporting open) | DC110V 8/20 US 1P | 
| Electrosurge protector | The feed line | 
| Surge protector monitoring system | Include software | 
| Transfer the Ethernet interface board | Eight | 
| Plastic line slot | VXC-25 | 
| Data cable | 8-core twisted twisted cable | 
| Lightning line | GJ1X7-9-1370-B | 
| Copper and steel grounding pole | L50*5*1500 | 
| Pull rod | Lappers and pads are included | 
| Pull line | GJ-70 | 
| Increase the shoulder frame | Processing according to Fig | 
| Lower anchor Angle Steel | G100/11 | 
TAG£º
